Design expertise. Without the full commission.
Sometimes you do not need an architect for eighteen months. You need one for an afternoon, before you commit. Feasibility, second opinions, and strategic advice — priced as advice, not as a project.
Four ways to use us.
Feasibility Study
Can this site carry this brief, at this budget? A written answer before you buy the land.
Typical · 2–4 weeksMaster-planning
Phasing, density, and circulation for multi-building developments.
Development Antriol · BonaireSecond Opinion
A review of drawings you already hold — from a studio with no stake in the outcome.
Typical · One weekFinancial Insight
Cost modelling and investment analysis, so the design decision and the money decision are the same decision.
MSc Accountancy ledAdvice, not a project.
We listen
A call, your documents, and the question you actually need answered.
We assess
Site, regulation, budget, and buildability — checked against what you are proposing.
We report
A written position you can hand to a bank, a board, or a contractor.
Cheaper than an expensive mistake.
Consultancy is the least expensive part of a project and the part with the most leverage. Talk to us before you commit.